Navigation Menu
Chimborazo
Chimborazo Summit Log (#823)
- Signed By: jpg59
- Date Submitted: May 12, 2004
- Date(s) climbed: 07/May/2004
Attempt terminated after 3h at 5650 m because the Ecuadorian Guides (employed by a French company)were not confident to continue despite the fact the snow was in good condition (no ice), a wonderful weather (no wind, -2°C), nearly full moon and a very good physical condition of all 5 participants. It was very frustrating and discouraging to use the same type of organization for future ascents.
About Peakware Contact Us Sponsorship Privacy Disclaimer
Copyright © 1998-2013 Interactive Outdoors, Inc. All rights reserved.
