Illimani

Illimani Trip Report (#3246)

  • Signed By: Charlotte Putz of Troistorrents, Switzerland
  • Date submitted: June 04, 2003
  • Date(s) climbed: 3rd june 2003

Three days after having summited H. Potosi, I stood on the top after 5 hours of climbing!!! Perfect weather and conditions, just a little wind. The crevasse below the summit needed to do some ice climbing and that was the last big effort before reaching the ridge where the sun was rising. Unforgettable. A really nice mountain!!!

Illimani Trip Report Index